Front Range Community College is beginning renovations on both Café’s at the Westminster Campus and the Larimer Campus to a Grab and Go concept. At both locations, FRCC currently has a full commercial kitchen and the concept is to renovate both locations, reduce physical footprint, remove the kitchen equipment, and redesign the space for a complete owner-run Grab and Go facility at each location. Construction is underway on the Westminster Campus with an estimated completion this summer. The Larimer Campus will kick-off construction in summer of 2023.
Westminster, Colorado
Estimated Completion Summer 2022