The new 63,000 SF Surgery and Recovery Center created space for the medical facility to perform surgeries and major operations on-site. It included8 operating rooms, offices, a reception area, and pre- and post-operative rooms.The entire second floor was dedicated to overnight patients for recovery and care.
This project was an addition to an existing facility and included services from conceptual site development all the way to construction administration and project sign off. Jordan served as the project manager and was responsible for the architectural drawings, along with coordinating and managing the design team.
*This project was completed with a previous firm.
Loveland, Colorado
2018